Fast Start Assembly Instructions
Parts and Tools
With the Fast Start™ Greenhouse, you can start seedlings, nurture transplants, and grow abundant vegetables and fragrant flowers. Made from rust-proof aluminum and rigid polycarbonate glazing, this sturdy, three-season greenhouse will provide you with many years of growing enjoyment! If you have any questions about the assembly or use of your greenhouse, please give us a call at 1-800-427-3363. Our Customer Service staff are happy to help.
Tools Needed For Assembly * Drill * 6' Ladder * Assorted drill bits * Phillips head bit * 4' Level * Phillips screw driver * Rubber mallet * Sledge hammer
Parts List Frame:
|
Part #
|
Description
|
Quantity
|
|
A1
|
Gable Base Frame
|
2
|
|
A2
|
Side Base Frame
|
2
|
|
A3
|
Corner Upright (right)
|
2
|
|
A4
|
Corner Upright (left)
|
2
|
|
A6
|
Wall Panel Cap
|
2
|
|
A7
|
Eave Rail
|
2
|
|
A8
|
Front Gable Frame
|
1
|
|
A9
|
Back Gable Frame
|
1
|
|
A10
|
Back Gable Frame
|
1
|
|
A11
|
Front Gable Frame
|
1
|
|
A13
|
Ridge Frame
|
1
|
|
A14
|
Gable Upright
|
2
|
|
A15
|
Roof Eave Cap
|
2
|
|
A16
|
Gable Upright (1 attached to door)
|
2
|
|
A17
|
Door Header Frame
|
1
|
Panels
|
P1
|
Side Wall Panels
|
2
|
|
P3
|
Roof Panel
|
2
|
|
P5
|
Door (attached to A16)
|
1
|
|
P6
|
Gable Panel (left)
|
2
|
|
P7
|
Gable Panel (right)
|
2
|
|
P8
|
Door Header Panel (right)
|
1
|
|
P9
|
Gable Panel (center)
|
1
|
Connectors & Hardware:
|
C2
|
2” round head bolt
|
16
|
|
C4
|
3/4” self-tapping screws
|
20
|
|
C6
|
1-1/2” round head screws
|
12
|
|
C7
|
Gable Upright Connector
|
4
|
|
C8
|
Door Head Connector
|
2
|
|
C9
|
Round Caps
|
6
|
|
C10
|
Square End Caps
|
6
|
|
|
Door Handle
|
1
|
|
|
Front Spinner Vent
|
1
|
|
|
Rear Automatic Vent
|
1
|
|
|
Bolts for Automatic Vent
|
4
|
|
|
1/4" Nut Driver
|
1
|
Parts Needed: 1/4" x 3" Lab bolts with washers, 8 4 x 4 Rot-resistant lumber, 4 1/2" Steel rods (rebar), 3' long sections, 6 Masking tape (recommended)
|